As part of work for the Wastewater Treatment Project, crews will be doing some utility work in the 500 block of Joffre Street, 1000-1100 block of Lyall Street and 400 block of Lampson Street from mid-November 2018 to mid-January 2019.
What to Expect
Utility work will consist of verifying the location of existing utilities, road cutting, excavation, electrical duct and manhole installation, concrete deliveries and trench paving.
The work zone will move daily and will be kept as small as possible, backfilling the trench as work progresses.
There will be no impact to utility services.
Noise associated with this work includes excavation machinery and truck back-up beepers and will not exceed the Township of Esquimalt’s noise bylaws.
Work Hours
- Monday to Friday 7:30 a.m. to 5:00 p.m.
Traffic Impacts
There will be single lane alternating traffic during work hours with road plates installed overnight to allow two-way traffic.
Traffic control areas will be delineated by cones and signs and controlled by flaggers.
Interruptions to driveway access during work hours will be minimized as much as possible. Residents will be informed in advance.