Overview
The Tillicum Road Improvement Project will include replacement of the road surface, curbs, gutters, pedestrian signals and sidewalks from Transfer Street to Craigflower Road on Tillicum Road. In addition, the crosswalk at the Transfer Street and Tillicum Road intersection will be upgraded, as well as a catch basin on the corridor.
Schedule
The work begins on June 6, 2018 and is expected to be completed by the end of August, 2018 (weather dependent).
Traffic impact
Transfer Street, the link road between Lampson and Tillicum, will be single lane alternating traffic between 9 a.m. and 3 p.m. Both lanes will be open before 9 a.m. and after 3 p.m.
One lane will remain open in each direction on Tillicum between 9 a.m. and 3 p.m. During the morning commute, both lanes in each direction will be open until 9 a.m. One southbound lane on Tillicum may be closed after 3 p.m.
Map
Please click here for project map.
Contact
For more information, please contact:
Jeff Miller, Director of Engineering and Public Works
Tel: 250-414-7108